eg-252:gbe
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionLast revisionBoth sides next revision | ||
eg-252:gbe [2008/11/13 18:58] – external edit 127.0.0.1 | eg-252:gbe [2010/10/05 08:31] – eechris | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Team Building Exercise ====== | ====== Team Building Exercise ====== | ||
- | Here is a selection of notes from the Team Building Exercise (last performed Tuesday | + | Here is a selection of notes from the Team Building Exercise (last performed Tuesday |
===== Russell Morris' | ===== Russell Morris' | ||
Line 87: | Line 87: | ||
* An agreed " | * An agreed " | ||
- | * You must have completed " | + | * You must have completed " |
* The chassis design has to be submitted to mecahnical workshop before Christmas. | * The chassis design has to be submitted to mecahnical workshop before Christmas. | ||
+ | * Sensors must be prototyped before Christmas. | ||
* There must be a web site of some from by beginning of second semester. | * There must be a web site of some from by beginning of second semester. | ||
* All documentation must be complete and on the web site by the date of the demonstration. | * All documentation must be complete and on the web site by the date of the demonstration. | ||
* The mouse must be ready for inspection by the end of teaching in the summer term. | * The mouse must be ready for inspection by the end of teaching in the summer term. | ||
+ | * There must be at least two reflective blog postings from each team member each semester. These should be relate to an aspect of the project that you have been responsible for. | ||
There may be others! | There may be others! |
eg-252/gbe.txt · Last modified: 2011/01/14 12:45 by 127.0.0.1